Skip to content

FILL 10005

Summary

📓 ✍️ ⬅️ ➡️

start: August 14, 2024 08:35:34 PM UTC

end: August 15, 2024 12:04:48 PM UTC

duration: 0 days 15:29:13.639000

tags:

  • PHYSICS

  • WIRES

  • OP_DUMP

comments:

  • wires ON at 09:22 and tune trims

  • lowered target longitudinal blowup at SB to 1.18 ns

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM