FILL 10006
Summary
start: August 15, 2024 12:04:48 PM UTC
end: August 16, 2024 03:32:29 AM UTC
duration: 0 days 15:27:40.858625
tags:
-
PHYSICS
-
WIRES
comments:
-
LHCb asked not to level yet on luminosity at the start of SB as it is not reliable, fixed later
-
Large impact of longitudinal blow up on IP1 virtual pile-up. As a consequence, two steps of beta* levelling were strongly shortened.
-
wires switched ON at 00:36 and tune trims
-
Dumped due to MKD issue
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM