Skip to content

FILL 10006

Summary

📓 ✍️ ⬅️ ➡️

start: August 15, 2024 12:04:48 PM UTC

end: August 16, 2024 03:32:29 AM UTC

duration: 0 days 15:27:40.858625

tags:

  • PHYSICS

  • WIRES

comments:

  • LHCb asked not to level yet on luminosity at the start of SB as it is not reliable, fixed later

  • Large impact of longitudinal blow up on IP1 virtual pile-up. As a consequence, two steps of beta* levelling were strongly shortened.

  • wires switched ON at 00:36 and tune trims

  • Dumped due to MKD issue

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM