FILL 10070
Summary
start: August 30, 2024 12:41:26 AM UTC
end: August 30, 2024 05:22:24 AM UTC
duration: 0 days 04:40:57.328750
tags:
-
PHYSICS
-
EPC_DUMP
comments:
-
Injection was perfect
-
During the ramp BBQ B2 V Gated flattened and stopped the QFB, switched QFB to Gated OD device for B2 and continued in the cycle.
-
Small tune optimization in collisions, emittance scan and started B* levelling
-
Beam was dumped due to a electrical glitch tripping RB.A12
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM









