FILL 10093
Summary
start: September 07, 2024 12:33:54 PM UTC
end: September 07, 2024 07:33:49 PM UTC
duration: 0 days 06:59:54.989000
tags:
comments:
-
dumped initial probe beam due to QPS board MQ.31R1 of RQD.A1 then reinjected
-
first bunch of each B2 PS batch is blown up in emittance at end of injection
-
BLM crate P3 stopped publishing and SIS triggered dump
Cycle duration
Beta-functions at the IPs
Crossing angles
Octupoles
Trims
Tune trims
Chromaticity Trims
Intensity
Cycle intensity
BBB SB intensity
Violin BBB intensity
SB bunch intensity
Bunch Length
Bunch Length Fill
Emittance
B1 along the cycle
B2 along the cycle
Emittance growth at injection
Summary violin plot
BBB in SB for B1
BBB in SB for B2
Bunch brightness
Beam properties summary
Luminosity
Overview
Luminous Regions
BBB luminosity in SB
Cross-sections
ADJUST
STABLE BEAM