FILL 10107
Summary
start: September 12, 2024 02:13:50 PM UTC
end: September 13, 2024 05:23:55 AM UTC
duration: 0 days 15:10:04.598000
tags:
-
PHYSICS
-
WIRES
-
GLITCH_DUMP
comments:
-
Observed some blow up of the first injected beams of B1 in V
-
RF expert adjusted the half detunning while injecting
-
30% threshold dump at the start of the ramp
-
Dumpend on electrical glitch (RD2.L5, RQX.L5, RTQX½.L5, RF cavirieys, ALICE and LHCb dipoles, MKIs tripped)
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM