FILL 10109
Summary
start: September 13, 2024 02:30:34 PM UTC
end: September 13, 2024 04:40:37 PM UTC
duration: 0 days 02:10:03.042125
tags:
comments:
-
25% of the BLM threshold dump at the start of the ramp
-
Minimum lifetime at collapse is 20 h
-
Dumped by RQ6.R3 QPS trigger during emittance scan (probably a SEU)
Cycle duration
Beta-functions at the IPs
Crossing angles
Octupoles
Trims
Tune trims
Chromaticity Trims
Intensity
Cycle intensity
BBB SB intensity
Violin BBB intensity
SB bunch intensity
Bunch Length
Bunch Length Fill
Emittance
B1 along the cycle
B2 along the cycle
Emittance growth at injection
Summary violin plot
BBB in SB for B1
BBB in SB for B2
Bunch brightness
Beam properties summary
Luminosity
Overview
BBB luminosity in SB
Cross-sections
ADJUST
STABLE BEAM