FILL 10119
Summary
start: September 16, 2024 07:17:53 AM UTC
end: September 16, 2024 10:32:28 AM UTC
duration: 0 days 03:14:35.506000
tags:
-
PHYSICS
-
EPC_DUMP
comments:
-
Good lifetime (>17 h) at the collapse
-
Beams were dumped by a trip of a dozen QPS on three separate QPS boards in sector 12 (ROD, ROF, RSDF, RQT). The QPS piquet investigated and advised to call the EPC piquet as for him the QPS triggered following current perturbations on the power converters