FILL 10119
Summary
start: September 16, 2024 07:17:53 AM UTC
end: September 16, 2024 10:32:28 AM UTC
duration: 0 days 03:14:35.506000
tags:
-
PHYSICS
-
EPC_DUMP
comments:
-
Good lifetime (>17 h) at the collapse
-
Beams were dumped by a trip of a dozen QPS on three separate QPS boards in sector 12 (ROD, ROF, RSDF, RQT). The QPS piquet investigated and advised to call the EPC piquet as for him the QPS triggered following current perturbations on the power converters
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM









