FILL 10119

Summary

📓 ✍️ ⬅️ ➡️

start: September 16, 2024 07:17:53 AM UTC

end: September 16, 2024 10:32:28 AM UTC

duration: 0 days 03:14:35.506000

tags:

  • PHYSICS

  • EPC_DUMP

comments:

  • Good lifetime (>17 h) at the collapse

  • Beams were dumped by a trip of a dozen QPS on three separate QPS boards in sector 12 (ROD, ROF, RSDF, RQT). The QPS piquet investigated and advised to call the EPC piquet as for him the QPS triggered following current perturbations on the power converters

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM