FILL 10120
Summary
start: September 16, 2024 10:32:28 AM UTC
end: September 16, 2024 03:54:20 PM UTC
duration: 0 days 05:21:51.953875
tags:
-
PHYSICS
-
EPC_DUMP
comments:
-
Access to fix ROD.A12B1 and for ATLAS to fix a rack turbine failure in UX15
-
A heat wave in the tunnel caused a loss of cryo maintain in MSR8
-
ROD.A12B1 tripped and dumped the beam at the start of the ramp
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

Violin BBB intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

Bunch brightness

Beam properties summary




