FILL 10120
Summary
start: September 16, 2024 10:32:28 AM UTC
end: September 16, 2024 03:54:20 PM UTC
duration: 0 days 05:21:51.953875
tags:
-
PHYSICS
-
EPC_DUMP
comments:
-
Access to fix ROD.A12B1 and for ATLAS to fix a rack turbine failure in UX15
-
A heat wave in the tunnel caused a loss of cryo maintain in MSR8
-
ROD.A12B1 tripped and dumped the beam at the start of the ramp