Skip to content

FILL 10363

Summary

📓 ✍️ ⬅️ ➡️

start: November 14, 2024 05:29:57 AM UTC

end: November 14, 2024 08:01:58 AM UTC

duration: 0 days 02:32:01.864375

tags:

  • MD

comments:

  • MD14364 RF flat bottom optimization for ion debunching

  • WS measurements of 1 train, every 10 minutes for 30 minutes

  • VRF = 6 MV

  • lifetime after 30 minutes 4 hours and 3.5% unbunched beam

  • 1.5 ns bunch length after 30 minutes

  • dumped and re-injected with VRF = 8 MV but stayed only 10 minutes due to pc trip

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Bunch Length Fill

Emittance

Luminosity

Cross-sections

ADJUST
STABLE BEAM