FILL 9796
Summary
start: June 18, 2024 10:24:58 PM UTC
end: June 19, 2024 04:00:45 AM UTC
duration: 0 days 05:35:46.515375
tags:
- BEAM_COMMISSIONING
comments:
-
Loss maps at 105.5, 93, 82.5, 72.5, 60 cm
-
RB.56 tripped during the rampdown of the previous fill but it was dumped on the same problem just before the asynch dump test
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

Violin BBB intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Summary violin plot

Bunch brightness

Beam properties summary

Luminosity
Overview

Cross-sections
ADJUST