FILL 9842
Summary
start: June 30, 2024 12:32:12 AM UTC
end: June 30, 2024 05:19:48 PM UTC
duration: 0 days 16:47:36.136625
tags:
-
PHYSICS
-
OP_DUMP
-
WIRES
comments:
-
2352 bunches
-
After turning on the LRBB, go back up and also increasing vertical with 1e-3 significantly improved the lifetime
-
Effect of tune trim +1e-3 on B1H was beneficial (120 cm)
-
7h in stable beams before reached the end of separation levelling in IP⅕
-
To avoid over heating the triplet beam were separated in IP5 at 13:05 (CET) and back HO at 13:55