FILL 9936
Summary

start: July 26, 2024 10:09:10 AM UTC
end: July 26, 2024 03:12:49 PM UTC
duration: 0 days 05:03:39.470875
tags:
comments:
-
large injecyion losse first injection of 72b, no issue with SPS craper
-
BBQ spectrum of B1H got very noisy at ~2.5 TeV
-
Dumped due to RF line 4B2 trip
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM





