FILL 9942
Summary

start: July 28, 2024 10:16:32 AM UTC
end: July 28, 2024 10:03:43 PM UTC
duration: 0 days 11:47:11.204250
tags:
-
PHYSICS
-
TO_STUDY
-
WIRES
-
OP_DUMP
comments:
-
extended stay at injection by 15 minutes, 63% losses in IR3. 10% higher emittances than usual, PU target needed to be increased
-
B1 after second longitudinal blowup slow debunching with abort gap contantly filling up
-
BSRT issue for B2
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM





