FILL 9978
Summary
start: August 05, 2024 04:34:44 PM UTC
end: August 06, 2024 06:29:49 AM UTC
duration: 0 days 13:55:04.831000
tags:
-
PHYSICS
-
WIRES
-
EPC_DUMP
comments:
-
WS B2V does not work
-
44% of losses at the start of the ramp
-
Large UFO in 6R5, 37% losses just after the collision process
-
LHCb magnet PC tripped and dumped the beam (despite cooling water temperature perfectly at the setpoint (26 deg, alarm at 27 deg; temperature drop after the trip))