Skip to content

FILL 9989

Summary

📓 ✍️ ⬅️ ➡️

start: August 10, 2024 03:02:00 PM UTC

end: August 11, 2024 08:16:50 AM UTC

duration: 0 days 17:14:50.336250

tags:

  • PHYSICS

  • WIRES

  • OP_DUMP

comments:

  • A bad injection for B2 with first bunches blown up. On the IQC we see injection oscilations but the kicker pulsed OK. The (average) injection oscillations are compatible with a ~5 urad miskick of the MKI.

  • 60% dump threshold at the start of the ramp

  • wires ON at 05:33 and tune trims

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM