Skip to content

FILL 9995

Summary

📓 ✍️ ⬅️ ➡️

start: August 12, 2024 01:49:57 AM UTC

end: August 12, 2024 02:18:04 PM UTC

duration: 0 days 12:28:07.201375

tags:

  • PHYSICS

  • TO_STUDY

comments:

  • B2 filled first due to B1 injection issue

  • energy matching resulted in less debunches beam at the start of ramp

  • Reported that the accumulation of debunched beam start during ramp preparation but before preparing RF for ramp

  • minimum lifetime at start of collisions 8h for B1 and 6h for B2

  • Dumped due to QPS trigger on RB.A23

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM