FILL 10612
Summary
start: May 10, 2025 02:01:42 PM UTC
end: May 11, 2025 04:38:34 AM UTC
duration: 0 days 14:36:52.095250
tags:
-
INTENSITY_RAMPUP
-
OP_DUMP
comments:
-
75b
-
setting up combined leveling (sep and beta*)
-
emittance scans (1.78um H and 1.72um V IP5, 2 and 1.9 in IP1)
-
50 Hz ripple on RQ5.LR7 (10 mA)
-
62 PU, down to 0.1 for CMS, then back to 60
-
LHCb injecting SMOG - Alice increased target at 23.48 CET - losses at <20cm, need to perform tune optimizations, B1 suffering more than B2 - no extra losses during xing angle leveling at the moment
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM








MIM analysis
RAMP B1 H
RAMP B1 V
RAMP B2 H
RAMP B2 V
STABLE BEAM B1 H
STABLE BEAM B1 V
STABLE BEAM B2 H
STABLE BEAM B2 V
q-Gaussian profile analysis
B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical




