Skip to content

FILL 10612

Summary

📓 ✍️ ⬅️ ➡️

start: May 10, 2025 02:01:42 PM UTC

end: May 11, 2025 04:38:34 AM UTC

duration: 0 days 14:36:52.095250

tags:

  • INTENSITY_RAMPUP

  • OP_DUMP

comments:

  • 75b

  • setting up combined leveling (sep and beta*)

  • emittance scans (1.78um H and 1.72um V IP5, 2 and 1.9 in IP1)

  • 50 Hz ripple on RQ5.LR7 (10 mA)

  • 62 PU, down to 0.1 for CMS, then back to 60

  • LHCb injecting SMOG - Alice increased target at 23.48 CET - losses at <20cm, need to perform tune optimizations, B1 suffering more than B2 - no extra losses during xing angle leveling at the moment

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM