Skip to content

FILL 10648

Summary

📓 ✍️ ⬅️ ➡️

start: May 20, 2025 07:09:30 AM UTC

end: May 20, 2025 03:04:48 PM UTC

duration: 0 days 07:55:18.035750

tags:

  • BEAM_COMMISSIONING

  • OP_DUMP

  • TO_BE_STUDIED

comments:

  • Performed ramp in steps with a pilot and nominal COLL settings

  • 450 GeV -> 1 TeV -> 2 TeV -> 3 TeV -> 5 TeV -> 6 TeV

  • B2 suffered all the time (bad lifetime started at injection), while B1 survived as expected

  • Emittance B1: 3.2/2.6 B2:4.5/4.2

  • Next step with an INDIV

Intensity

Emittance

Luminosity

Cross-sections

ADJUST
STABLE BEAM