FILL 10718
Summary
start : June 14, 2025 10:40:57 AM UTC
end : June 14, 2025 10:31:09 PM UTC
duration : 0 days 11:50:12.487375
tags :
comments :
lower default emittance values for LLevelling applied, removed one step for the fast b* ramp-up (to 64cm), optimized lifetime with Q scans, IP2 lumi at hl-lumi targetand wanted to reach 59Hz/ub, b2 lifetime about 20h b1 about 25h
Cycle duration
Beta-functions at the IPs
Crossing angles
Octupoles
Trims
Tune trims
Chromaticity Trims
Intensity
Cycle intensity
BBB SB intensity
Violin BBB intensity
SB bunch intensity
Bunch Length
Bunch Length Fill
Emittance
B1 along the cycle
B2 along the cycle
Emittance growth at injection
Summary violin plot
BBB in SB for B1
BBB in SB for B2
Bunch brightness
Beam properties summary
Luminosity
Overview
Luminous Regions
BBB luminosity in SB
Cross-sections
ADJUST
STABLE BEAM
MIM analysis
RAMP B1 H
RAMP B1 V
RAMP B2 H
RAMP B2 V
STABLE BEAM B1 H
STABLE BEAM B1 V
STABLE BEAM B2 H
STABLE BEAM B2 V
q-Gaussian profile analysis
B1 Horizontal
B1 Vertical
B2 Horizontal
B2 Vertical