FILL 10852
Summary
start: July 18, 2025 06:47:34 AM UTC
end: July 18, 2025 07:30:49 PM UTC
duration: 0 days 12:43:14.484125
tags:
- PHYSICS
comments:
-
Early blow‑ups, 1 bunch in B1H before levelling, then 3 more at 13:20; later 12 B1 bunches unstable at 25 cm Q-prime raised 10 going to 15.
-
ALICE high‑lumi test, BLM thresholds/gains raised, then restored; BLM warnings at P2.
-
Chroma set to 20/20 and emittance scan performed before programmed dump.
Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
BBB SB intensity

SB bunch intensity

Bunch Length Fill

Emittance
BBB in SB for B1

BBB in SB for B2

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM








MIM analysis
RAMP B1 H

RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H

STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis
B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical




