Skip to content

FILL 10855

Summary

📓 ✍️ ⬅️ ➡️

start: July 19, 2025 12:55:19 AM UTC

end: July 19, 2025 01:32:04 PM UTC

duration: 0 days 12:36:45.536875

tags:

  • PHYSICS

  • QPS_DUMP

comments:

  • Blow up (mostly B1) during ramp

  • Sectors 23 and 34 lost due to thunderstorm, QPS was triggered, TI didnt see any perturbation in the grid

  • Heaters were fired for RQ10.R2 and RQ10.L4 and cryo maintain was lost

  • M1B2 quenched

  • All above systems and circuits recovered without issues

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM

MIM analysis

RAMP B1 H

RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H

STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis

B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical