Skip to content

FILL 10857

Summary

📓 ✍️ ⬅️ ➡️

start: July 19, 2025 01:51:33 PM UTC

end: July 20, 2025 08:15:29 AM UTC

duration: 0 days 18:23:55.466250

tags:

  • PHYSICS

  • OP_DUMP

comments:

  • Consistent blow up on selected bunches of beam 1 during the ramp

  • Access required to repair the fire protection system

Cycle duration

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM

MIM analysis

RAMP B1 H

RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H

STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis

B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical