FILL 10879

Summary

📓 ✍️ ⬅️ ➡️

start: July 26, 2025 09:06:34 AM UTC

end: July 27, 2025 11:24:56 AM UTC

duration: 1 days 02:18:22.420625

tags:

  • DUCK

comments:

  • No beam for the entire shift

  • Dump of pilots from power converter fault of RQ7.R4B1 (again - free wheel diode water flow). Access to fix water flow meters

  • As part of the intervention, the UPS (EOK103/47) got disconnected and caused problems in S45 (loss of communication with ~20PCs) and in P4 (loss of cryo cards and the 2 BLM crates). The root cause of the issue is not clear

  • Cryo needs another access to P4 to replace a broken card (following the power cut) on the DFB.

  • Intervention in P4 was not successful, putting the machine in power-save mode

  • RF and cryo issues are resolved

Intensity

Emittance

Luminosity

Cross-sections

ADJUST
STABLE BEAM

MIM analysis

RAMP B1 H
RAMP B1 V
RAMP B2 H
RAMP B2 V
STABLE BEAM B1 H
STABLE BEAM B1 V
STABLE BEAM B2 H
STABLE BEAM B2 V

q-Gaussian profile analysis

B1 Horizontal
B1 Vertical
B2 Horizontal
B2 Vertical