FILL 10889

Summary

📓 ✍️ ⬅️ ➡️

start: July 30, 2025 12:50:48 AM UTC

end: July 30, 2025 04:53:30 AM UTC

duration: 0 days 04:02:41.998375

tags:

  • DUCK

comments:

  • electrical perturbation

  • Two protection dumps during INJ PROBE set‑up

  • fill dedicated to LBDS/MKB conditioning and recovery from the RB power‑converter

Intensity

Emittance

Luminosity

Cross-sections

ADJUST
STABLE BEAM

MIM analysis

RAMP B1 H
RAMP B1 V
RAMP B2 H
RAMP B2 V
STABLE BEAM B1 H
STABLE BEAM B1 V
STABLE BEAM B2 H
STABLE BEAM B2 V

q-Gaussian profile analysis

B1 Horizontal
B1 Vertical
B2 Horizontal
B2 Vertical