FILL 10895

Summary

📓 ✍️ ⬅️ ➡️

start: July 30, 2025 09:39:13 AM UTC

end: July 30, 2025 04:06:22 PM UTC

duration: 0 days 06:27:08.498000075

tags:

  • PHYSICS

  • WATER_DUMP

comments:

  • Vacuum spike in IP2 after ~1 hour of stable beams, BLMs reached 63% of dump threshold in 4L2. ALICE informed that they also saw it in the detector

  • Pressure spike seen in VGI.79.6L2

  • Xray is required to evaluate if there is damage to the module but operation continues smoothly

  • Lost water distribution in point 8, beam dumped

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM

MIM analysis

RAMP B1 H

RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H

STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis

B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical