Skip to content

FILL 10942

Summary

📓 ✍️ ⬅️ ➡️

start: August 14, 2025 01:58:07 AM UTC

end: August 14, 2025 06:46:41 AM UTC

duration: 0 days 04:48:33.337625

tags:

  • DUCK

  • OP_DUMP

comments:

  • Filling interrupted by 800MHz cavity issue in the SPS, leading to too long bunches at extraction (blocked by BQM)

  • Decided to dump and reinject

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

Violin BBB intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

Bunch brightness

Beam properties summary

Luminosity

Cross-sections

ADJUST
STABLE BEAM

MIM analysis

RAMP B1 H

RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H

STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis

B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical