FILL 10956
Summary

start: August 18, 2025 02:23:42 AM UTC
end: August 18, 2025 09:50:14 AM UTC
duration: 0 days 07:26:31.905625
tags:
comments:
-
Hydraulic hammer test during stable beams, the vibrations generated by the drilling did not have any effect on the beams
-
Beam dumped, TCTPV.4R2.B2 triggered an interlock
Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims
Tune trims

Chromaticity Trims

Intensity
Cycle intensity

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM








MIM analysis
RAMP B1 H
RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H
STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis
B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical