Skip to content

FILL 11196

Summary

📓 ✍️ ⬅️ ➡️

start: October 16, 2025 06:26:37 AM UTC

end: October 16, 2025 06:42:03 PM UTC

duration: 0 days 12:15:26.020625

tags:

  • PHYSICS

comments:

  • B1 with 1.45e11 ppb and B2 with 1.48e11 ppb, running with asymmetric intensities

  • increased octupoles for B1

  • warning in IR6 after longitudinal blowup of B1 (increased bunch length target)

Cycle duration

Beta-functions at the IPs

Crossing angles

Trims

Tune trims

Intensity

Cycle intensity

Debunched beam

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM

MIM analysis

RAMP B1 H

RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H

STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis

B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical