FILL 11226
Summary
start: October 27, 2025 07:30:07 AM UTC
end: October 27, 2025 06:04:07 PM UTC
duration: 0 days 10:34:00.258500
tags:
- PHYSICS
comments:
-
1.42e11 B1 and 1.84e11 B2
-
6 mV RF voltage at injection B1 as low bunch intensity
-
warning for start of ramp losses 40%
-
reached 120fb-1
-
dumped due to RF M2B1
Cycle duration

Beta-functions at the IPs

Crossing angles

Trims
Tune trims

Intensity
Cycle intensity

Debunched beam

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance
B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity
Overview

Luminous Regions

BBB luminosity in SB

Cross-sections
ADJUST





STABLE BEAM








MIM analysis
RAMP B1 H

RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H

STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis
B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical




