Skip to content

FILL 11237

Summary

📓 ✍️ ⬅️ ➡️

start: November 03, 2025 03:09:25 AM UTC

end: November 03, 2025 04:14:06 PM UTC

duration: 0 days 13:04:40.772000

tags:

  • PHYSICS

  • OP_DUMP

comments:

  • 1.4e11 B1 and 1.6e11 B2

  • 0.07 um/h B1 and 0.03 B2

  • pressure tests in IR3, IR7

  • low mu run for CMS

Cycle duration

Beta-functions at the IPs

Crossing angles

Octupoles

Trims

Tune trims

Chromaticity Trims

Intensity

Cycle intensity

Debunched beam

BBB SB intensity

Violin BBB intensity

SB bunch intensity

Bunch Length

Bunch Length Fill

Emittance

B1 along the cycle

B2 along the cycle

Emittance growth at injection

Summary violin plot

BBB in SB for B1

BBB in SB for B2

Bunch brightness

Beam properties summary

Luminosity

Overview

Luminous Regions

BBB luminosity in SB

Cross-sections

ADJUST

STABLE BEAM

MIM analysis

RAMP B1 H

RAMP B1 V

RAMP B2 H

RAMP B2 V

STABLE BEAM B1 H

STABLE BEAM B1 V

STABLE BEAM B2 H

STABLE BEAM B2 V

q-Gaussian profile analysis

B1 Horizontal

B1 Vertical

B2 Horizontal

B2 Vertical